Request No. RQQ-2016-CKU-039
Engineering and Contract Administration Services at Brampton
Metrolinx is accepting bids (“Requests”) for provision of engineering services for Preliminary Design, Detailed Design and Preparation of Tender Documents, Assistance with Procurement and Evaluation Process, Construction Administration and Engineering Services During Construction and Post-Construction Services, as more particularly described in this Request Document as required by Metrolinx, which Work relates to the Brampton and Malton GO Stations Rehabilitation Project.
Request enquiries and other communications are to be directed to the procurement representative Rachael Yiu at (416) 202-5551, Rachael.Yiu@metrolinx.com.
A Mandatory Site Meeting will be held at 9:00 a.m. on August 29, 2016 . The Meeting Area will be inside the Malton GO Station Building. Detail information can be found in the Tender Document. Failure of Bidder to be present and registered from the time the meeting is called to order until the meeting is adjourned will result in disqualification from bidding.
Bidders must wear hard hats, safety boots, safety vests and have safety glasses with them at the site meeting(s). Failure to satisfy these requirements will result in exclusion from the site.
Request submissions will be accepted until the Closing of 3:00 p.m., Tuesday, October 4, 2016 via Merx electronic bid submission (EBS) and will be opened by Metrolinx staff as soon as is practicable after the designated Closing. Details on where and when vendors can obtain information on bids received, will be made available on Metrolinx’s website.
Please note, effective Monday, February 10th, 2014 for any newly issued tenders Metrolinx will no longer be conducting Public Openings.
Only Consultants who possess the following experience and qualifications will be considered for award of this Contract:
The Consultant must demonstrate that it possesses the following experience and qualifications:
- The necessary resources to sustain and complete the Services to the satisfaction of Metrolinx;
- Fifteen (15) years of experience in design, construction support and project management of transportation facilities;
- Fifteen (15) years demonstrated experience with construction projects undertaken on a facility which continues to operate during construction.